Services / Renewables
Solar, batteries, EV and heat pumps. Every step in-house.
We survey, design, calculate and install ourselves — then stay for the servicing. One contractor for the whole job, including the paperwork.
What we do.
Solar PV — full evaluation to handover
- Roof and structural survey
- Shading calculations
- System design
- Payback calculations
- Installation and commissioning
- Monitoring, servicing and aftercare
Battery storage
- Batteries with new solar systems
- Retrofits to existing PV
- Backup configurations
EV charging
- Home charger installations
- Workplace and commercial charging
- Charger payment and revenue management for shared chargers
- V2G-ready (vehicle-to-grid) installs
Heat pumps — start to finish
- Heat loss calculations
- Heat pump sizing
- Electrical installation
- Connection into your heating system
- Controls and commissioning
Paperwork included
- DNO applications (G98/G99)
- Export-tariff (SEG) guidance
- Handover pack with all certificates
Aftercare
- Monitoring setup and walkthrough
- Servicing schedules
- Support after handover
Renewables jobs we've finished.
What the brief was, what we did, and how it ended. All projects →

Solar retrofit — panels, skylights and all the paperwork
A black-on-black array threaded between skylights on a low-pitch roof — surveyed, designed and installed in-house, with the isolation and export paperwork done.
Read the case study →
Heat pump installation — outdoor units to cylinder room
A twin-unit air source heat pump installation — outdoor units set on proper bases, a new unvented cylinder, and the controls wired and commissioned.
Read the case study →
Home EV charging — installed and properly tested
A run of home charger installations across the county — different houses, different chargers, same standard: neat mounting, protected supplies, and every unit load-tested before handover.
Read the case study →Get a customised quote.
Tell us about the job and we'll come back with a quote tailored to it — usually within one working day.
What each installation involves.
The scope, the approvals and the paperwork behind each technology. Technical detail and figures →
Solar PV and battery storage
- Roof survey: pitch, orientation, structural condition and shading assessment
- System sized to actual consumption, not roof area
- DNO notification under G98, or prior approval under G99 for larger arrays
- Battery and inverter selection, with storage sized to self-consumption
- Export metering and registration for a Smart Export Guarantee tariff
- Handover pack: schematics, commissioning records and warranties
EV charging
- Supply assessment and main fuse rating check before specification
- Dedicated circuit with the RCD protection required by BS 7671
- Load management where the existing supply will not carry the full load
- Smart charge points meeting the 2021 charge point regulations
- Back-office, access control and billing for shared or commercial units
- Installation notified and certified on completion
Heat pumps
- Room-by-room heat loss calculation before anything is specified
- Emitter and pipework review — undersized radiators are the usual failure point
- Electrical supply upgrade where the existing board cannot carry the unit
- Boiler Upgrade Scheme grant of £7,500, or £9,000 for off-gas-grid homes
- Controls and metering set up for the running costs the design assumed
- Commissioning records and a documented handover
How every job runs.
Survey
We visit, measure and assess. No guesswork.
Design & quote
A clear scope and a clear price, in writing.
Install
Installed, tested and certified on completion.
Aftercare
Servicing, monitoring and support after handover.
Renewables FAQs.
Will solar actually pay for itself?
That's the first thing we work out. The survey includes shading and payback calculations for your roof and usage — if the numbers don't work, we'll tell you.
Can you do the whole heat pump job, not just the electrics?
Yes. Heat loss calculations, sizing, the electrical installation and connection into your heating system — one contractor, start to finish.
Who handles the grid paperwork?
We do. DNO applications (G98/G99) are submitted as part of the job, and we'll point you at the best export tariff for your setup.
Got a complicated job? Tell us about it.
We'll take a look and give you a straight answer on price and timescale.